Multi-Site Signage Rollouts

One program. Every location accounted for.

From ten locations to hundreds, AIS coordinates surveys, permitting, manufacturing, installation, reporting, and ongoing support through one accountable team.

A signage rollout isn't one project repeated 100 times.

A multi-site signage rollout is a single coordinated program that delivers signage across many locations — surveys, permits, manufacturing, installation, reporting, and service managed together instead of site by site. What makes it hard is that the locations don't match: site conditions, mounting and electrical requirements, landlord criteria, municipal sign codes, permitting timelines, construction schedules, and installation constraints all vary by market.

AIS builds the structure that keeps those variables coordinated — one set of standards, documented field conditions per location, permitting handled where it happens, and a single record of status across the program.

Recent multi-site programs

Current AIS-managed healthcare signage programs spanning multiple states and facility types.

Intermountain Health building identification signage on a medical center facade

Intermountain Health

90+ locations across Utah, Montana, Nevada, and Colorado.

90+ locations2023–Current

Delivered: Channel letters · Directories · Monuments & pylons · Interior branding

CommonSpirit brick office building with AIS installation truck in foreground

CommonSpirit

180+ locations across Colorado, Kansas, Arizona, Tennessee, Kentucky, and Texas.

180+ locations2022–Current

Delivered: Channel letters · Directories · Monuments & pylons · Interior branding

What makes multi-site rollouts difficult

Every site is different

Measurements, existing conditions, mounting substrates, electrical access, and site access rarely repeat from one location to the next.

AIS runs site surveys and validates conditions before production, so each location is built and installed against documented field conditions rather than assumptions.

Permitting happens locally

Sign codes, landlord criteria, drawing requirements, and approval timelines differ in every municipality a program touches.

Permitting and code coordination are managed per market as part of the program, including landlord criteria, drawings, and the approvals required before installation.

Schedules move at different speeds

Construction, openings, remodels, and landlord milestones do not line up neatly across a portfolio of locations.

Project management sequences surveys, permits, production, and installation location by location, so a delay at one site does not stall the rest of the program.

Visibility gets harder as volume grows

Approvals, production, shipping, installation, and blocked sites become difficult to track once a program spans dozens or hundreds of locations.

Real-time cloud-based reporting keeps location status, milestones, and open items in one record, so stakeholders can see where every site stands.

How AIS manages a multi-site signage rollout

  1. 01

    Program Discovery & Standards

    Consultation and discovery establish the scope, brand standards, and sign types the program will repeat across locations.

  2. 02

    Site Surveys & Validation

    Field surveys document measurements, existing conditions, mounting, and electrical so each location is designed against reality.

  3. 03

    Permitting & Code Coordination

    Local sign codes, landlord criteria, drawings, and approvals are coordinated market by market ahead of installation.

  4. 04

    Project Management & Reporting

    A project team carries schedule, open items, and communication across every location, backed by real-time reporting.

  5. 05

    Manufacturing

    Signage is manufactured in-house to the approved program standards, protecting consistency from the first location to the last.

  6. 06

    Logistics & Installation

    Staging, shipping, and field installation are coordinated nationwide through AIS's managed installation network.

  1. 07

    Closeout & Ongoing Support

    Completion photos, punch lists, permit closeout, and warranty details are documented, then rolled into long-term maintenance and 24/7 dispatch.

Visibility across every location.

AIS uses a cloud-based reporting system to give customers real-time visibility into project status across their program — from surveys and permitting through production, installation, and closeout.

See how AIS manages and supports programs
LocationSurveyPermitProductionInstallComplete
Location 001
Location 002
Location 003
Location 004
Location 005

Illustrative example of program status tracking. Not the actual reporting interface.

Two layers of accountability.

Project Management

Keeps individual locations moving — schedules, permits, production, installation, open issues, and resolution as each site progresses.

Account Management

Keeps the overall relationship aligned — priorities, communication, brand standards, and program strategy across the locations still ahead.

Both layers are covered under manage and support.

Built for programs that keep growing.

Long-standing historical proof: multi-location program experience at AIS was earned decades ago on accounts that expanded year over year — where the work had to stay consistent as the location count climbed.

Party City storefront with branded signage at sunset

Party City

Party City became AIS's first national account, beginning with a single store and ultimately growing into signage work for approximately 600 locations nationwide.

North Fork Bank branch with exterior signage

North Fork Bank

Work with North Fork Bank expanded from approximately 45 branches to 450 before the bank's acquisition by Capital One — building the discipline and repeatable program experience that complex, multi-location organizations require.

Read the full AIS story

Common questions about multi-site signage rollouts

Planning signage across multiple locations?